SBAS and RNSS Archives - Page 4 of 40 - Inside GNSS - Global Navigation Satellite Systems Engineering, Policy, and Design

SBAS and RNSS

February 15, 2018

The Federal Budget is Confusing, but GPS Appears OK – for Now

Congress is in the midst of a confusing multi-budget-year scramble to fund the government for fiscal year 2018 – which is now nearly half over – while taking into account additional monies made available in a budget deal signed February 9 and keeping an eye on the deficit ballooning from that deal and under the FY19 White House budget submitted February 12.

Read More >

By Dee Ann Divis
[uam_ad id="183541"]
February 6, 2018

Japan-Australia Quasi-Zenith Satellite System (QZSS) Industrial Utilization Workshop

This free workshop will share information about QZSS and GPS related technologies and the latest developments in the applications of this technology in a range of sectors including agriculture, autonomous driving, advanced route guidance and the maritime sector. The all-day workshop will explore avenues for future cooperation with Australian organizations, both in the private and public sectors and report on trials undertaken in Australia using QZSS applications.

Read More >

By Inside GNSS
[uam_ad id="183541"]
January 1, 2018

RNSS and the ITU Radio Regulations

All applications of satellite navigation show a strong growth. They can now rely on four global systems (GPS, GLONASS, Galileo and BeiDou) and additional regional systems, sometimes aiming for future global extension (QZSS, NavIC). All these systems and their applications rely on very limited satellite orbit spectrum. This article is providing background and insights on the growing pressure on this limited resource, giving rise to proposals for “sharing” spectrum. How satellite navigation will survive and find the necessary spectrum resources to grow is reviewed in details in the following paragraphs.

Read More >

By Ingo Baumann
December 18, 2017

GPS III RFP Delayed Again as GAO Underscores GPS Schedule Challenges

An additional delay in release of the GPS III RFP emerged just as federal watchdogs released a new report detailing the challenges Air Fore managers will face in keeping all the components of the modernization program on track.

The long-expected report from the Government Accountability Office looks at the overall effort to update GPS including developing a new ground system, more capable receiver cards for military equipment and new satellites to sustain and improve the constellation.

Read More >

By Inside GNSS
November 27, 2017

Lockheed Martin Assembles Third U.S. Air Force GPS III Satellite

The GPS III SV03 fully assembled. Photo courtesy of Lockheed Martin.

The U.S. Air Force’s third GPS III satellite in production flow at Lockheed Martin’s advanced satellite manufacturing facility in Denver is now fully integrated into a complete space vehicle.

GPS III Space Vehicle 03 (GPS III SV03) followed the first two GPS III satellites on a streamlined assembly and test production line. Technicians successfully integrated the satellite’s major components – its system module, navigation payload and propulsion core – into one fully-assembled space vehicle on August 14.

Read More >

By Inside GNSS
IGM_e-news_subscribe